Mid Sweden University

miun.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
En bergentreprenads omfattning: Några seniora bergbyggares och experters erfarenheter av lämpligt innehåll i det kontrakt som innehåller berguttaget, vid bergdrivning med metoden borra-spräng
Mid Sweden University, Faculty of Science, Technology and Media, Department of Natural Science, Design, and Sustainable Development (2023-).
2023 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Detta kanske kan ses som en grundläggande crash course om berg-byggande. När ett bergutrymme ska byggas, vilka moment ingår lämpligen i samma entreprenadkontrakt som berguttaget och/eller samordnas med detta? Studien har varit ett försök att skapa sig en uppfattning om detta. Studien visade att det finns en rad moment, utöver de som är nödvändiga för själva bergdrivningen, som med fördel tas med i samma entreprenadkontrakt som denna. Exempel på detta är väg/fyllning, mätvallar/dammar, markförlagd kanalisation, borrning för infästningsbultar och portaler, och vissa betongarbeten. Skälen är ofta relaterade till uppfyllande av krav, tidsbesparing och logistik. Det är praktiskt att lägga dessa arbeten under samma samordningsansvar, för att de ska kunna utföras i någon mån parallellt, i syfte att komprimera tidplan, bättre utnyttja både personella resurser och utrustning som ändå är på plats, och kunna nyttja luckor i produktionen som kan uppstå under t.ex. beslutsprocesser vid geologisk osäkerhet. Studien gör inga anspråk på att vara heltäckande utan syftar endast till att ge vägledning av generisk karaktär avseende vilka moment som, beroende på t.ex. objektets karaktär, entreprenörens kompetens och resurser, entreprenadform m.m. kan vara lämpliga att inkludera i samma kontrakt som bergdrivningen. Den inledande litteraturstudien gav mycket lite information om just den huvudsakliga frågeställningen, varför intervjuer istället valdes som metod för besvarandet av studiens huvudsakliga frågeställning.

Abstract [en]

Perhaps this can be seen as a crash course in the basics of rock construction. When a rock space is to be built, which parts of the work are appropriate to include in the same construction contract as the rock excavation, and/or to have under the same coordinating contractor. The study was an attempt to get an idea of this. The study showed that there are a number of elements, in addition to those necessary for the actual rock excavation, which are advantageously included in the same construction contract as this. Examples of this are road/filling, measuring embankments/dams, underground canalisation, drilling for fixing bolts and portals, and possibly some concrete work. The reasons are often related to fulfilment of requirements, time saving and logistics. It is practical to put these works under the same coordination responsibility, so that they to

some extent can be carried out in parallel, in order to compress the schedule, make better use of both human resources and equipment while they are on site, and be able to take advantage of gaps in production that may arise during, for example, decision-making processes in the event of geological uncertainty. The study makes no claims to be comprehensive, but aims only to provide guidance of a generic nature regarding which elements, depending on e.g. the nature of the object, the contractor's competence and resources, form of contract, etc. may be appropriate to include in the same contract as the rock excavation. The initial literature study provided very little information on the main question, which is why interviews were chosen as the investigative method.

Place, publisher, year, edition, pages
2023. , p. 49
Keywords [en]
coordination rock construction, rock construction logistics
Keywords [sv]
samordning bergbyggande, bergcykel, bergbyggnadslogistik
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:miun:diva-49151OAI: oai:DiVA.org:miun-49151DiVA, id: diva2:1790527
Subject / course
Building Engineering BY1
Educational program
Building Engineering Sustainable Building TBYHG 180 higher education credits
Supervisors
Examiners
Note

2023-06-26

Available from: 2023-08-23 Created: 2023-08-23 Last updated: 2025-09-25

Open Access in DiVA

fulltext(1857 kB)63 downloads
File information
File name FULLTEXT01.pdfFile size 1857 kBChecksum SHA-512
17cc5591ff90e78fa804d5289aedd636df5ddbc79b366e8935c6c4e7025cd899176b31183bb1694a65f5a1118e23f5d883df39cc24cf1cd27e092e721cb18196
Type fulltextMimetype application/pdf

By organisation
Department of Natural Science, Design, and Sustainable Development (2023-)
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 63 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 229 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf