Mid Sweden University

miun.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Icke värdeskapande moment inom prefabricering av trähus hos Storsjöhus AB:s husfabrik.: En fallstudie
Mid Sweden University, Faculty of Science, Technology and Media, Department of Ecotechnology and Sustainable Building Engineering.
2016 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Storsjöhus AB:s husfabrik ligger i Pilgrimstad, cirka 30 kilometer söder om Östersund. De tillverkar trähuskomponenter för byggnadssektorn, till kunder över hela Sverige. I dagsläget tillverkas väggelement längs med två tillverkningslinjer. Genom att bygga ut befintlig fabrik kan tillverkningen utökas med ytterligare en tillverkningslinje.

 

Studien vars resultat presenteras i denna rapport har två syften. Det ena är att se om det finns några icke värdeskapande moment inom prefabricering av väggelement, i trähus hos Storsjöhus AB:s husfabrik, och hur dessa kan undvikas? Det andra syftet är att utifrån ett leanperspektiv ge ett förslag på utformning av utbyggnaden av fabriken. För att minska på icke värdeskapande moment i produktionen.

 

Genom observationer kunde vissa icke värdeskapande moment identifieras i produktionen. Utifrån resultatet samt litteraturstudier har ett förslag på utbyggnaden tagits fram, samt förbättringsförslag vilket presenteras i denna rapport. Vissa av förbättringsförslagen medför investeringskostnader medan andra enklare förslag knappat medför några kostnader. Målet med de framtagna förbättringsförslagen är att minska på onödigt slöseri och underlätta arbetet för personalen. Ett av förbättringsförslagen som tagits fram är att på ett tydligare sätt märka upp virkesdelar innan de går vidare i produktionen. Genom att gör vissa förändringar på planerad utbyggnad kan denne planeras mer utifrån ett leanperspektiv och olika slöseri i produktionen minska.

Avgränsningar som gjorts i studien är att endast se på produktionen av väggelement samt utomhusmiljön på fabriken. I studien tas ingen hänsyn till kostnader för ändringar och utbyggnad.

Abstract [en]

Storsjöhus AB’s house factory is located in Pilgrimstad, approximately 30 km south of Östersund. They manufacture house- and building components made out of wood, to customers all over Sweden. Today the factory uses two production lines where they produce mainly wall elements. By remodeling- and extending the factory, the production can be increased with another production line.

The results of this study that are presented in this thesis have two purposes. One is to find out if there are any non-value creating moments within prefabrication of wall elements and how these can be prevented in buildings made out of wood at Storsjöhus AB. The other purpose is, from a Lean perspective, to give an example of how to configure the new extended factory and at the same time minimize non-value creating moments in the production.

 

Some of the non-value creating moments could be identified through observations. From the result and literature studies a proposition of a new extension to the factory have been developed, including suggestions for improvement, which are presented in this thesis. Some of the suggested improvements are combined with investments, some suggestions have a small or no impact on the finances. The goal with the proposed improvements is to reduce non-necessary waste and facilitate the work for the staff. One of the suggested improvements that have been proposed is to label the elements in a more efficient way before they are sent further on in the production. With some small modifications to the planned extension, it can be planned from a Lean perspective, and different kind of waste in the production can be reduced.

This thesis only brings up the production of wall elements and the outdoor environmental of the factory. No consideration have been taken to costs for changes and extension of the building.

Place, publisher, year, edition, pages
2016.
Keywords [sv]
Logistik, Lean produktion, kvalitetsförbättring
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:miun:diva-28839Local ID: BT-V16-G3-011OAI: oai:DiVA.org:miun-28839DiVA, id: diva2:972237
Subject / course
Building Engineering BY1
Educational program
Building Engineering Sustainable Building TBYHG 180 higher education credits
Supervisors
Examiners
Available from: 2016-09-20 Created: 2016-09-20

Open Access in DiVA

fulltext(946 kB)251 downloads
File information
File name FULLTEXT01.pdfFile size 946 kBChecksum SHA-512
88d76bcebabda8fdc123ca9ea8deb57fa6d529b1a290f28faa5c8eeb3d830e114437e2a704133c0f06b05960490f994d3e94f288bb5fcdc7fd1133fadc0aaed8
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Åsengård, Marie
By organisation
Department of Ecotechnology and Sustainable Building Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 251 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 369 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf