Prototyputveckling – Isotimber väggblock
Mid Sweden University, Faculty of Science, Technology and Media, Department of Ecotechnology and Sustainable Building Engineering.
Mid Sweden University, Faculty of Science, Technology and Media, Department of Ecotechnology and Sustainable Building Engineering.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Träbyggande har stark historisk förankring i Sverige. För drygt ett sekel sedan sattes ett förbud in mot att bygga hus i fler än två våningar i trä på grund av den ansedda brandrisken materialet medförde. Vid Sveriges inträdande i EU år 1994 togs det gamla beslutet bort och utvecklingen inom träbyggandet för flerbostadshus har därefter fått en rejäl uppgång. Utvecklingen har medfört ett modernare sätt att bygga, från att tidigare ha byggt allt på byggarbetsplatsen till montage av prefabricerade väggmoduler. Med detta tillvägagångssätt har byggandet både kunnat säkra en högre kvalitet samt effektiviserats. 

Ett företag som arbetar med prefabricerade väggblock är Isotimber. Deras väggblock är unik på det sätt att de endast innehåller trä, för att uppnå ett högre isolervärde har råvaran trä kombinerats med urfrästa luftspalter. Isotimber har haft en önskan att utveckla sin produkt eftersom de fastskruvade kassetterna som bildar ett enhetligt väggblock separerar vid lyft. Lyftpunkterna har placerats genom borrade hål i väggblocken med genomförda lyftstroppar, ett tillvägagångssätt som Isotimber önskat förändra. Tvärkrafterna som uppstått vid lyften har verkat diagonalt mot väggblocken och antal lyftpunkter har varierat. 

Studien har riktat sig mot att utveckla det befintliga väggblocket samt studera om lyft har gått att utföra på ett annat sätt än i dagsläget. Lyftpunkternas placering har även granskats. 

Resultatet av produktutvecklingen har lett till att en limträbalk har placerats i överkant av blocken. Det har medfört att lyftpunkter har förflyttats till limträbalken där håltagning för stroppbanden kommer att utföras. Antal lyftpunkter har blivit beroende av väggblockens spännvidd och de tvärkrafter som uppstår vid lyft skall inverka vertikalt mot väggblocken. Resultatet av den nya väggblocksprototypen har krävt dimensionering av limträbalk vid lyftpunkter samt infästningarna mellan väggblock och limträbalk. 

Väggblockets förändringar har bidragit till ett smidigare montagesystem. Den monterade limträbalken kan även anses ge en mindre nedböjning i väggblocket. Lyftpunkterna har blivit fler med bestämda avståndsintervall för att motverka separationer mellan de ihopskruvade kassetterna i väggblocken. 

Abstract [en]

Building with   wood has a strong historical anchorage in Sweden. Just over a century ago, a   ban was imposed on building houses on more than two floors of wood due to the   perceived fire risk caused by the material. At Sweden's accession to the EU   in 1994, the old decision was removed and the trend in the construction of   wooden houses for multi-family houses has subsequently increased   dramatically. The development has resulted in a more modern way of building,   from building everything on the construction site to the assembly of   prefabricated wall modules. With this approach, construction has been able to   ensure a higher quality and efficiency. 

A company that   works with prefabricated wall blocks is Isotimber. Their wall blocks are   unique in that they contain only wood, in order to achieve a higher   insulation value, the raw material wood has been combined with milled gaps of   air. Isotimber has had the desire to develop its product because the screwed   cassettes that forms a uniform wall block, separates during the lifts. The   lifting points have been placed through drilled holes in the wall blocks with   inserted lifting straps, an approach that Isotimber wishes to change. The   transverse forces that have occurred during the lift have acted diagonally   against the wall blocks and the number of lifting points has varied. 

The study has   been aimed at developing the existing wall block and to study whether lifting   could be done in a different way than today. The position of the lifting   points has also been examined. 

The result of   product development has led to a laminated wooden beam being placed above the   blocks. This has meant that lifting points have been moved to the laminated   wooden beam where perforation for the straps will be executed. The number of   lifting points has become dependent on the width of the wall blocks, and the   transverse forces that arise during lifting must be vertical to the wall   blocks. The result of the new wall-block prototype has led to dimensioning of   the laminated wooden beam at the lifting points, as well as the connections   between the wall block and the laminated wooden beam. 

The wall block   changes have contributed to a smoother mounting system. The laminated wooden   beam can also be considered to give a smaller deflection in the wall block.   The lifting points have become more at fixed range intervals to counter the   separations between the screwed cassettes in the wall blocks. 

Place, publisher, year, edition, pages
2017. , p. 58
Keywords [en]
Isotimber, wall block, prototype, Eurokod 5
Keywords [sv]
Isotimber, väggblock, prototyp, Eurokod 5
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:miun:diva-31526DOI: BT-V17-G3-011OAI: oai:DiVA.org:miun-31526DiVA, id: diva2:1137790
Subject / course
Building Engineering BY1
Educational program
Building Engineering Sustainable Building TBYHG 180 higher education credits
Supervisors
Examiners
Note

Betyg 170707, H14.

Available from: 2018-08-30 Created: 2017-09-01 Last updated: 2018-08-30Bibliographically approved

Open Access in DiVA

fulltext(1957 kB)450 downloads
File information
File name FULLTEXT01.pdfFile size 1957 kBChecksum SHA-512
985c8d69fde887b8257419754db4f642fd7dcb58d8235870d49cf55e2dd0462c596beeca8de38a173641b4bf3884326b3a1c352520f84d1a67813baf3e71bf9c
Type fulltextMimetype application/pdf

Other links

Publisher's full text

Search in DiVA

By author/editor
Norberg, Simon
By organisation
Department of Ecotechnology and Sustainable Building Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 450 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 229 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf